Month: November 2014

Heron Point Project

Trussel - west of Fairview creek

Trussel - west of Fairview creek

Trussel - west of Fairview creek

Under trussel

Under trussel

Fairview Creek north of Trussel

Space for a path.

Space for a path.

Fairview Creek Trussel

Heron Point Wetland

Heron Point wetland

Advertisements

Concept – Fairview Bike Trail connections plan

Future extention using the old Reynolds metals rail line

Future extention using the old Reynolds metals rail line

follow north until connecting Marine drive and 40 mile loop

follow north until connecting Marine drive and 40 mile loop

Build trail to raidroad, head east to 223rd.  Proposed pedistrian bridge crossing 223rd,  create a railroad crossing over the tracks.  continue north via 223rd or Dike right of way

Build trail to raidroad, head east to 223rd. Proposed pedistrian bridge crossing 223rd, create a railroad crossing over the tracks. continue north via 223rd or Dike right of way

Halsey crossing, follow PGE right of way to I-84, proposed pedestian bridge over I-84, continue following PGE

Halsey crossing, follow PGE right of way to I-84, proposed pedestian bridge over I-84, continue following PGE

First leg.  Connect to 201st, follow PGE right of way to under bridge crossing, connect trail to Halsey

First leg. Connect to 201st, follow PGE right of way to under bridge crossing, connect trail to Halsey